The Al Fanar Ceramic Factory Ventilation Project in Riyadh, Saudi Arabia, involved the installation of essential civil, electrical, and mechanical works for improving the ventilation system within the ceramic production facility. The project aimed at optimizing air circulation, temperature control, and air quality within the factory, ensuring a safer and more efficient working environment for employees. The scope included the design and construction of ventilation systems, along with the integration of electrical and mechanical infrastructure. Al Fanar Ceramics Factory served as both the owner and the client for the project, while DAR Engineering provided consultation and supervision, ensuring that all works adhered to industry standards and regulations. The project was successfully completed, contributing to the factory's operational efficiency and employee well-being.
Let's collaborate to create innovative and sustainable solutions for your construction and trading needs.
Request a Quote